Know what your budget needs to cover.

Free early guidance, a paid detailed cost review, and support with the decisions that follow. For homes and commercial spaces.

01 /FREE · INSTANT ONLINE

Instant budget range.

Explore what your project could cost before committing. Calculate a range online, then ask us about the result if you would like a conversation.

What you provide
Project type, location, dimensions and broad specification
What you receive
An indicative range, main allowances and a downloadable summary
When
On screen immediately. No email needed to calculate.
The optional conversation clarifies your brief and next steps; it does not include a measured cost plan.
02 /PAID · REVIEWED FOR YOUR PROJECT

Detailed cost plan.

Turn your drawings and scope into an itemised cost plan. We agree the information needed, level of detail, deliverables and service fee before you commission the work.

What you provide
Current drawings, scope, material choices and available quotations
What you receive
Checked quantities where measurable, itemised costs, price evidence and a written review
When
Prepared and reviewed after appointment, to an agreed timetable
Service fee quoted after reviewing your brief. Specialist inputs are identified and agreed separately where needed.

Both routes support budget decisions. A detailed cost plan is a reviewed estimate, not a contractor’s fixed construction quotation. Submitting an enquiry does not commission paid work.

DELIVERABLES /Detail that helps you decide

More evidence. Fewer hidden assumptions.

The detail comes from better information: checked quantities, agreed materials and relevant prices. A tighter range is earned through that work, rather than promised in advance.

Drawings and material samples reviewed in a completed interior
  1. 01

    A traceable starting point

    Project location, drawing revision, measurement basis, specification and the date of the cost information.

  2. 02

    A scope you can check

    Separate building work, fittings and equipment. Identify quantities, allowances, exclusions and quotations still needed.

  3. 03

    The full budget conversation

    Review professional services, approvals, tax, contingency and client costs alongside the works. Resolve overlaps before adding totals.

  4. 04

    Choices with a cost consequence

    Compare agreed alternatives and identify which changes need supplier or contractor confirmation. Record the next review point.

START /What to send

Bring what you have.

Send the project location, approximate size, current drawings or photographs, intended specification, target budget and timing. Existing quotations help us check the scope and pricing basis.

We first identify the available information and agree the deliverables, revision allowance, timescale and fee. A survey, specialist advice or a quantity surveyor may need a separate appointment for the scope involved.

Send my project for review
RIBA /Understand the stages

Plan the support, as well as the build.

The RIBA Plan of Work describes stages 0–7. It is a project framework, not a fee tariff. Our appointment identifies the services, responsibilities and specialist input actually included.

  1. 0

    Strategic Definition

    Test whether the brief and available budget can work together.

  2. 1

    Preparation and Briefing

    Identify surveys, constraints and the professional team required.

  3. 2

    Concept Design

    Compare layouts and the broad cost implications of each option.

  4. 3

    Spatial Coordination

    Update the cost plan as the layout and specialist inputs develop.

  5. 4

    Technical Design

    Use coordinated details and specifications to develop pricing information.

  6. 5

    Manufacturing and Construction

    Agree site-query support, visits, change reviews and cost reporting.

  7. 6

    Handover

    Plan handover, defects follow-up and final cost review.

  8. 7

    Use

    Agree any later performance review or improvement advice separately.

STAGES 5–6 /During construction and handover

Make the site-stage scope explicit.

Construction support can be commissioned as a separate paid service. Agree the scope and fee before it is needed, especially if the programme or design changes.

Visits & design questions

Agree the number and purpose of visits, written follow-up and how design queries are handled. Visits do not mean continuous site supervision.

Changes & cost control

Identify who reviews variations, maintains cost records and checks payment valuations. Contract administration and certification depend on a specific appointment.

Handover & extra time

Set out handover or defects visits, expenses, additional design work and charges for an extended programme. Additional services should be agreed before they are undertaken.

PRICE BASIS /Reviewed 24 October 2026

References you can inspect.

Public market guides help check early allowances. They are not a live quotation feed, and their publication dates and pricing bases differ. Only comparable scope should be used to adjust a budget.

London extensions

£3,000–5,000 / m²Architecture for London · 2026 guide

Construction reference excluding VAT and professional fees. Kitchens and bathrooms are additional. Used to calibrate the current UK rear-extension base; other geometry and specification adjustments remain model assumptions.

View the source

London dormer lofts

From £2,400 / m²Architecture for London · loft guide

A construction starting rate, excluding VAT and fees. Used for the current lower dormer base. Project size, structure and access still need checking; the model upper range and style factors are allowances.

View the source

Whole-home refurbishment

Scope mattersBradley Van Der Straeten · July 2026

Its whole-house references include allowances for kitchens, bathrooms and fixed joinery. They are a separate scope check, not rates to add on top of the room calculator.

View the source

Commercial fit-out

Office ≠ caféCushman & Wakefield · 2026 guide

Office benchmarks have a December 2025 price basis and different fit-out inclusions. They do not directly price cafés, retail or studios. Our core commercial and room unit allowances remain editable ZINK assumptions.

View the source

How to read your result

The current UK extension revision updates the rear-extension base, the lower dormer base and kitchen/bathroom allowances. Other rates, regional multipliers and design factors remain modelling assumptions. The UK review does not update Irish prices. Saved extension versions retain their earlier basis until you choose to refresh them.

Kitchen and bathroom reference amounts are before VAT. The default fitting allowances start at 20% VAT and follow the selected fittings VAT rate; your own gross quotations stay as entered. Use the basis shown beside each field. Professional fees are an allowance, not an agreed ZINK service fee or a complete list of every consultant.

Before committing, recheck scope, local quotations, start date, access, structural work and all unpriced items. A long delay or a design change needs a fresh review; this website does not apply automatic future price inflation.

A useful next step, at the right level.

Start with a free conversation, or send your information for a detailed-service proposal.

Architectural visualisation
Architectural visualisation
Concept drawing